What Is The Scarborough Subway Extension?

The Scarborough Subway Extension is a 7.8 kilometre extension of TTC’s Line 2 Bloor-Danforth Subway, from the existing Kennedy Station northeast to McCowan Road/Sheppard Avenue.

What will replace the Scarborough RT?

Scarborough Subway Extension
On April 14, 2022, the TTC Board approved decommissioning of the SRT in 2023 and converting a portion of the Scarborough RT’s right-of-way into a dedicated busway. This will provide safe and accessible interim bus service until the Scarborough Subway Extension (SSE) is opened by the Province of Ontario in 2030.

What are they building at McCowan Sheppard?

Construction. Construction of the tunnel launch shaft is underway at Sheppard Avenue and McCowan Road. This site will serve at the entrance point for the tunnel boring machine. It will then be converted into a station site for the stations, rail and systems contract.

Which transit is used in Scarborough?

The Scarborough Rapid Transit line was approved by the TTC in January 1977 to meet the considerable population growth anticipated in Scarborough. After Kennedy Station, there would be stations at Lawrence, Ellesmere, Midland, the Scarborough Town Centre, and McCowan.

Is the Scarborough RT closing?

The TTC’s Line 3, also known as Scarborough Rapid Transit (SRT), is set to close in 2023. The current line runs a bit past Scarborough Town Centre and is slated to be replaced with buses until the Line 2 subway extension to the area is completed in approximately 2030.

How much is the bus fare from Scarborough to York?

The average bus ticket price from Scarborough to York is £13. The best way to find cheap bus tickets from Scarborough to York is to book your tickets as early as possible. Prices tend to rise as your travel date approaches, so book in advance to secure the best prices!

Where does York stop in Scarborough trains?

The York–Scarborough line runs between the city of York, England, and the town of Scarborough. Towns and villages served along the way are Malton, Norton-on-Derwent and Seamer.

What are they building at Midland and Eglinton?

Construction has been underway since spring 2021 to extend the TTC’s Line 2 subway further north into Scarborough, with three new subway stations.

How long is a TTC subway train?

Toronto subway
Train length 6 cars (Lines 1 and 2) 4 cars (Lines 3 and 4) 3 cars (Line 5)
Headway 2 min 21 s – 5 min (Lines 1 and 2) 5 min – 6 min 45 s (Line 3) 5 min 30 s (Line 4)
Technical
System length 76.9 km (47.8 mi) 47.0 km (29.2 mi) (under construction)

When did Kennedy subway station open?

1980
Kennedy is both a terminal and interchange station on Line 2 Bloor–Danforth and Line 3 Scarborough of the Toronto subway system. Opened in 1980, it is located east of the Kennedy Road and Eglinton Avenue intersection.

How do you get around Scarborough?

With a good network of trains and buses, not to mention ferries and tramways, getting around Scarborough without a car is not just possible – it’s fun! And it’s ideal territory for a staycation.

  1. Catch the train into town.
  2. Ride the tramway down the cliffs.
  3. Catch the bus to Whitby.
  4. Onward by boat, bus or train…

Does TTC work in Scarborough?

Scarborough Centre GO Bus Terminal Entrance
Location on Street, on Bus Concourse Level, at west end of Scarborough Centre GO Bus Terminal, entering east end of TTC Bus Platform (there is no direct access from the street, entrance is inside the bus terminal).

How long is the bus journey from Scarborough to Whitby?

The average bus between Scarborough and Whitby takes 50 min and the fastest bus takes 43 min. The bus runs, on average, 5 times per week from Scarborough to Whitby.

How many platforms does Scarborough train station have?

5
Scarborough railway station

Scarborough
Managed by TransPennine Express
Platforms 5
Other information
Station code SCA

Why the Scarborough RT was built?

Scarborough’s light rail line started life as a planned streetcar route that would connect the under-construction Kennedy station at the end of the Bloor-Danforth line to Scarborough Town Centre via a dedicated right of way, short tunnel, and concrete section of elevated track.

What time does the Scarborough RT start running?

Hours of Operation:
First Train to Kennedy: 5:47 a.m. weekdays, 5:51 a.m. Saturdays/holidays, 7:49 a.m. Sundays. Last Train to Kennedy: 1:19 a.m. every day. First Train to McCowan: 6:10 a.m. weekdays, 6:13 a.m. Saturdays/holidays, 8:21 a.m. Sundays.

How long is the train journey from Scarborough to Whitby?

The average journey time by train between Scarborough and Whitby is 6 hours and 15 minutes, with around 16 trains per day. The journey time may be longer on weekends and holidays, so use our Journey Planner on this page to search for a specific travel date.

How long does the Coastliner take from York to Scarborough?

The new route will take less than 90 minutes to travel from York city centre to the heart of Scarborough, due to it having fewer stops than the regular Coastliner services.

How much is a train from Toronto to New York?

How to Travel From Toronto to New York City by Train, Bus, Car, and Plane

Time Cost
Train 13 hours from $175
Flight 90 minutes from $150
Bus 11-13 hours from $60
Car 8 hours, 40 minutes 490 miles (790 kilometers)

How long is it from York to Scarborough on the train?

The average journey time by train between York and Scarborough is 51 minutes, with around 43 trains per day.

What does RT stand for Scarborough?

rapid transit
Name. From when the line opened in 1985 until 2015, it was known as the “Scarborough RT” or “SRT”. The “RT” in Scarborough RT stood for “rapid transit“. The name Scarborough Line is used on the official TTC website and 2014 TTC Ride Guide.